What this means in The Cove
A Cove replacement should account for the walkout lower level’s above-grade walls, which carry more heating load than a buried basement, and for any zoning or second system serving the upper floors or garage. Sizing on total floor area alone tends to miss both. Note how many systems the home has, which areas each serves, whether the garage is separately heated, and how the existing equipment vents.



